|
|
Tool Free Assembly Metal Table Welding For Fast Workshop Deployment
| MOQ: | 1 |
| Price: | 500-1000 USD |
| Standard Packaging: | 3000*2000*300mm |
| Delivery Period: | 15-25 work days |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union |
| Supply Capacity: | 500 units/month |
Tool free Assembly metal table welding
,CE metal table welding
,1000mm stainless steel welding table top
Tool free Assembly D28 3D Welding Table for Fast Workshop Deployment is a D28 hole system, fully tool free, modular, and quick assembly 3D flexible welding fixture platform. The core is to achieve instant splicing and deployment of the table, frame, and fixture without the need for wrenches/screwdrivers/bolts throughout the process, relying on a quick locking pin+snap structure. It focuses on 10 minutes for the entire machine to go online, 5 minutes for fixture changing, ready to use, and flexible expansion.
| countertop dimensions | 1000×1000 / 1200×1200 / 1500×1500 / 2000×1000mm |
| Table thickness | 25mm |
| Hole specifications | Φ28mm, Hole spacing 100 ± 0.05mm |
| Flatness | 0.1mm/1000mm |
| Repetitive positioning accuracy | ±0.02mm |
| Rated load capacity | 5 tons/unit (uniform load) |
![]()
![]()
- Zero tools: No need for wrenches, screwdrivers, bolts, or nuts throughout the entire process, relying solely on hands and quick locking pins
- Rapid assembly: A single person can complete the entire device from loose parts to usable state in 10 minutes
- Ready to use: assembled without debugging or calibration, directly welded onto the workpiece
- Quick changeover: Complete the switch of different workpiece fixtures in 5 minutes, and produce multiple varieties of small batch tools
- 3D positioning: precise positioning in X/Y/Z 3D space through columns, beams, and angle gauges, suitable for complex workpieces
- Infinite splicing: Multiple seamless splices form a super large platform (such as 12m × 2m) to meet the welding needs of ultra long workpieces
- Full compatibility: Tool free Assembly D28 3D Welding Table for Fast Workshop Deployment compatible with D28 standard fixtures, plug and play
- Labor cost: Tool free Assembly D28 3D Welding Table for Fast Workshop Deployment No need for professional assembly workers, ordinary operators can complete assembly and changeover
- Time cost: Deployment time has been reduced from traditional days to 10 minutes, and changeover time has been reduced from hours to 5 minutes
- Space cost: Can be quickly disassembled, moved, does not occupy fixed workstations, improves workshop space utilization
- Return on investment: One platform replaces multiple sets of specialized fixtures, reducing fixture costs by 90% and increasing production capacity by 40%+